|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BS 1377 : Part 4 : 1990 |
|
| California
Bearing Ratio Test (data for density) |
|
|
|
|
|
|
| Location |
|
|
|
|
|
|
Job ref. |
|
|
|
| |
|
|
|
|
|
|
Borehole/Pit no. |
|
|
| Soil description |
|
|
|
|
|
Sample
No. |
|
|
| |
|
|
|
|
|
|
Depth |
|
|
m |
| Sample prep.
method BS1377: Part 4: 1990: 7.2.3/7.2.4/7.2.5* |
|
|
|
|
| Preparation
procedure |
|
Static,______________layer(s), with/without
tamping* |
|
|
| |
|
|
2.5 kg rammer/ 4.5 kg rammer/ vibrating hammer* |
|
|
| |
|
|
Specified density* |
|
Volume of mould |
Specified effort* |
|
| |
|
|
________Mg/m3 |
|
V________cm3 |
_______layers |
|
| |
|
|
|
|
|
|
|
_______blows
per layer |
| *Calculated
mass of soil required (m1) |
|
|
|
g |
|
|
|
| *Mass of mould
+ baseplate + soil (m3) |
|
|
|
g |
|
|
|
| *Mass of mould
+ baseplate (m2) |
|
|
|
g |
|
|
|
| *Mass of soil
(m3-m1) |
|
|
|
|
|
g |
|
|
|
| *Soaking time |
|
|
|
|
|
days |
|
|
|
| *Time for
water to appear at top of sample |
|
|
|
|
|
|
| *Final
swell |
|
|
|
|
|
|
mm |
|
|
|
| *Mass of mould
+ baseplate + soil after soaking (m4) |
|
g |
|
|
|
| *Mass of soil
after soaking (m4-m2) |
|
|
|
g |
|
|
|
| Maximum
bearing ratio from plotting chart |
|
|
|
% |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| Bulk density
(unsoaked) |
*P=m1/V |
|
|
Mg/m3 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
Mg/m3 |
|
|
|
| |
|
|
*P=(m3-m2)/V |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| Moisture
content (w) |
|
|
|
|
|
% |
|
|
|
| *Dry density
(unsoaked) |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| Pd=100P/(100+w) |
|
|
|
|
|
Mg/m3 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| *Delete as
appropriate |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Operator |
Checked |
Approved |
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Form 4E |
|
|
|
|
|
|
|
|
|
|
|
|